Base Frame Equipment, H beam 200x100x5.5 - (3500 mm for Siemens or 3000 mm for Nokia) HDG (70 mikron) complete with accessori Rp Concrete for counterweight K-225 (include rebar) - Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard Anchor HILTI M20 - 25cm (Include HILTI Chemicals)Ĭ. Bored Pile Ø 40cm (supply and installation) longitudinal bar 8 pcsī. Excavation at rocky soil (Labor and Equipment)Ī. Wooden Pile Ø 12 - 15 cm (supply and installation) Wooden Pile Ø 10 - 12 cm (supply and installation) Wooden Pile Ø 8 - 10 cm (supply and installation) Wooden Pile Ø 6 - 8 cm (supply and installation) Mini Pile Ø 40cm (supply and installation)į. Well Foundation Ø 100cm (supply and installation) longitudinal Bar 20 pcs (Cassion Foundation)Į. Well Foundation Ø 80cm (supply and installation) longitudinal Bar 16 pcs (Cassion Foundation)ĭ. Bored Pile Ø 60cm (supply and installation) longitudinal bar 12 pcsĬ. Concrete K-225 with SK SNI 03.2002 Standardī. Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard Backfilling foundation soil and compaction per 300mmĬoncrete work d. Tower Foundation C.1 Standard Works Soil work a. Cable ducting for Rooftop sites (Legrand) Sub Total B General Construction C. Accessories: Cable, Cage, Clamp, Bracket, Scoon, Box, Bolt & Nut, Etc) Non Standard (if applicable) - NYFGBY 4x16mm2 - NYFGBY 4x25mm2 concrete post for underdeveloped lease area (15x15x250 cm)į. Barbed wire fence for underdeveloped lease area SPK SIPIL, BON MATERIAL SPK SIPIL, BON MATERIAL BON FABRIKASI BON MEĮ. Site Construction 10 m x 15 m -įence (Included stone masonry,sloof,post) Landscaping (gravel) thickness 15 cm Sliding door 1,5 m width Yard Lamp Phillips mercury (includes material, labor, cabling and accessories) Yard Lamp TL 2 x 36 (type GMS HG Artolite) + Box + Bracket (includes labor, cabling and accessories) General Construction B.1 Fence and Yard Standard a. Detailed Site Design - Tower Foundation Design - Construction Drawing and BoQ Mobilization from ground to rooftop for SST Mobilization from ground to rooftop for Poles Measurement of tower position, shelter & Landscape) IMPLEMENTATION Preparation work - Site Clearing and Preparation (inc. PRE-IMPLEMENTATION Sub Total I Pre-Implementation BILL OF QUANTITY & UNIT RATE - CIVIL WORKS & TOWER WORKS
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |